10-13  铁路运输主要技术经济指标(2000年)
MAJOR ECONOMIC AND TECHNICAL INDICATORS OF RAILWAY TRANSPORT (2000)
 
 
         Items 太原铁路局Taiyuan Railway
Bureau
大同铁路局Datong Railway
Bureau
临汾铁路局Linfen Railway
Bureau
客运机车日车公里  (公里)  Daily Distance per Freight Locomotive (km) 419     497     467    
货运机车日车公里  (公里)  Daily Distance per Passenger Locomotive (km)  362     583     433    
货运机车平均牵引总重量  (吨)  Average Total Tonnage of Freight Locomotives (ton) 2581     2992     2285    
    蒸汽机车             Steam Locomotives  
    内燃机车       Diesel Locomotives 2296     2136     2285    
    电力机车       Electric Locomotives 2690     3002     2300    
货运机车日产量  (万吨公里) Average Daily Ton-kilometers of 59.1     164.8     75.5    
      Locomotives (10 000 ton-km)  
    蒸汽机车       Steam Locomotives  
    内燃机车        Diesel Locomotives 56.9     57.7     76.1    
    电力机车       Electric Locomotives  59.9     167.3     57.4    
 蒸汽机车万吨公里耗煤 (公斤)   Coal Consumption of Steam Locomotive (kg)  
 内燃机车万吨公里耗油 (公斤)   Oil Consumption of Diesel Locomotive (kg) 42.7     63.8     28.9    
 电力机车万吨公里耗电    Electricity Consumption of Electric 158.5     91.9     186.5    
          (千瓦小时)          Locomotive (10 000 kwh)  
 旅客列车技术速度  (公里/小时)    Technical Speed of Passenger Trains (km/hr) 58.0     55.8     59.4    
 旅客列车旅行速度  (公里/小时)    Traveling Speed of Passenger Trains (km/hr) 48.9     48.4     51.5    
 货物列车技术速度  (公里/小时)    Technical Speed of Freight Trains (km/hr) 39.1     52.2     47.4    
 货物列车旅行速度  (公里/小时)    Running Speed of Freight Trains (km/hr) 28.2     44.4     36.2    
 货物列车运行正点率  (%)    Punctuality Rate of Freight Trains in  Running (%) 95.4     98.4     97.4    
 货物列车出发正点率  (%)    Punctuality Rate of Freight Trains at Departure (%)  95.2     98.5     97.5    
 旅客列车运行正点率  (%)    Punctuality Rate of Passenger Trains in  99.5     99.2     99.0    
          Running (%)  
 旅客列车出发正点率  (%)    Punctuality Rate of Passenger Trains at 99.8     99.8     99.7    
      Departure (%)  
 货车周转时间          (天)   Trunning Around Time of Freight Cars (day) 1.5     1.7     1.6    
 货车一次作业停留时间  (小时)    Handling Time of Freight Cars (hour) 18.7     11.0     15.1    
 货车中转停留时间      (小时)    Transfer Waiting Time per Car (hour) 4.3     3.8     6.2