10-13 铁路运输主要技术经济指标(2002年) MAJOR ECONOMIC AND TECHNICAL INDICATORS OF RAILWAY TRANSPORT (2002) |
||||
指 标 | Item | 太原铁路局Taiyuan
Railway Bureau |
大同铁路局Datong
Railway Bureau |
|
客运机车日车公里 (公里) | Daily Distance per Freight Locomotive (km) | 468 | 464 | |
货运机车日车公里 (公里) | Daily Distance per Passenger Locomotive (km) | 396 | 583 | |
货运机车平均牵引总重量 (吨) | Average Total Tonnage of Freight Locomotives (ton) | 2658 | 3196 | |
蒸汽机车 | Steam Locomotives | |||
内燃机车 | Diesel Locomotives | 2586 | 2236 | |
电力机车 | Electric Locomotives | 2744 | 3208 | |
货运机车日产量 (万吨公里) | Average Daily Ton-kilometers of | 70.8 | 177.7 | |
Locomotives (10 000 ton-km) | ||||
蒸汽机车 | Steam Locomotives | |||
内燃机车 | Diesel Locomotives | 73.9 | 60.3 | |
电力机车 | Electric Locomotives | 67.6 | 180.8 | |
蒸汽机车万吨公里耗煤 (公斤) | Coal Consumption of Steam Locomotive (kg) | |||
内燃机车万吨公里耗油 (公斤) | Oil Consumption of Diesel Locomotive (kg) | 30.8 | 65.8 | |
电力机车万吨公里耗电 | Electricity Consumption of Electric | 162.3 | 92.2 | |
(千瓦小时) | Locomotive (10 000 kwh) | |||
旅客列车技术速度 (公里/小时) | Technical Speed of Passenger Trains (km/hr) | 61.3 | 55.5 | |
旅客列车旅行速度 (公里/小时) | Traveling Speed of Passenger Trains (km/hr) | 51.9 | 47.7 | |
货物列车技术速度 (公里/小时) | Technical Speed of Freight Trains (km/hr) | 42.9 | 52.9 | |
货物列车旅行速度 (公里/小时) | Running Speed of Freight Trains (km/hr) | 30.0 | 46.5 | |
货物列车运行正点率 (%) | Punctuality Rate of Freight Trains in Running (%) | 93.3 | 98.5 | |
货物列车出发正点率 (%) | Punctuality Rate of Freight Trains at Departure (%) | 91.8 | 98.6 | |
旅客列车运行正点率 (%) | Punctuality Rate of Passenger Trains in | 99.3 | 99.1 | |
Running (%) | ||||
旅客列车出发正点率 (%) | Punctuality Rate of Passenger Trains at | 99.9 | 99.8 | |
Departure (%) | ||||
货车周转时间 (天) | Trunning Around Time of Freight Cars (day) | 2.2 | 1.8 | |
货车一次作业时间 (小时) | Handling Time of Freight Cars (hour) | 19.0 | 10.2 | |
货车中转停留时间 (小时) | Transfer Waiting Time per Car (hour) | 5.6 | 3.5 | |