铁路运输主要技术经济指标(2003年) MAJOR ECONOMIC AND TECHNICAL INDICATORS OF RAILWAY TRANSPORT (2003) |
|||
指 标 | Item | 太原铁路分局Taiyuan
Railway Bureau |
大同铁路分局Datong
Railway Bureau |
客运机车日车公里 (公里) | Daily Distance per Passenger Locomotive (km) | 478 | 445 |
货运机车日车公里 (公里) | Daily Distance per Freight Locomotive (km) | 401 | 590 |
货运机车平均牵引总重量 (吨) | Average Total Tonnage of Freight Locomotives (ton) | 2689 | 3351 |
蒸汽机车 | Steam Locomotives | ||
内燃机车 | Diesel Locomotives | 2671 | 2373 |
电力机车 | Electric Locomotives | 2712 | 3363 |
货运机车日产量 (万吨公里) | Average Daily Ton-kilometers of | 72.3 | 186.7 |
Locomotives (10 000 ton-km) | |||
蒸汽机车 | Steam Locomotives | ||
内燃机车 | Diesel Locomotives | 77.7 | 62.0 |
电力机车 | Electric Locomotives | 66.4 | 190.0 |
蒸汽机车万吨公里耗煤 (公斤) | Coal Consumption of Steam Locomotive Per 10 000 tons.km (kg) | ||
内燃机车万吨公里耗油 (公斤) | Oil Consumption of Diesel Locomotive Per 10 000 tons.km (kg) | 29.3 | 64.0 |
电力机车万吨公里耗电 | Electricity Consumption of Electric | 163.8 | 89.1 |
(千瓦小时) | Locomotive Per 10 000 tons.km (10 000 kwh) | ||
旅客列车技术速度 (公里/小时) | Technical Speed of Passenger Trains (km/hr) | 61.6 | 54.4 |
旅客列车旅行速度 (公里/小时) | Traveling Speed of Passenger Trains (km/hr) | 53.7 | 46.9 |
货物列车技术速度 (公里/小时) | Technical Speed of Freight Trains (km/hr) | 43.1 | 52.4 |
货物列车旅行速度 (公里/小时) | Running Speed of Freight Trains (km/hr) | 31.0 | 46.5 |
货物列车运行正点率 (%) | Punctuality Rate of Freight Trains in Running (%) | 93.9 | 98.7 |
货物列车出发正点率 (%) | Punctuality Rate of Freight Trains at Departure (%) | 92.2 | 98.7 |
旅客列车运行正点率 (%) | Punctuality Rate of Passenger Trains in Running (%) | 99.5 | 99.1 |
旅客列车出发正点率 (%) | Punctuality Rate of Passenger Trains at Departure (%) | 99.8 | 99.7 |
货车周转时间 (天) | Trunning Around Time of Freight Cars (day) | 2.1 | 1.7 |
货车一次作业时间 (小时) | Handling Time of Freight Cars (hour) | 21.4 | 9.6 |
货车中转停留时间 (小时) | Transfer Waiting Time per Car (hour) | 5.4 | 2.8 |